Applications withdrawn
Chubu Electric Power withdrew its applications to restart Hamaoka Units 3 and 4 in September 2026, after being accused of fabricating seismic data for the Shizuoka plant. The company’s president and chairman announced their resignations on 14 September.
Setback for nuclear policy
The government’s Strategic Energy Plan, adopted in February 2025, vowed maximum use of nuclear power, reversing the policy shift after the 2011 earthquake. Just 15 reactors have restarted since 2011.
Higher bills in central Japan
Without the restart, electricity bills in Chubu Electric’s service area are expected to stay elevated, because the utility relies on thermal generation with high fuel costs. For more, see our economy section.
Source: Chubu Electric Power, Nuclear Regulation Authority and Japan Data (Nippon.com) reporting, September 2026; Yomiuri Shimbun (14 September 2026).
Related: Mizuho To Stop Lending To New Coal Power Projects · JFE Steel To Halt Blast Furnace in Eastern Japan As Demand Falls · Japan Reviewing Export Policy On Coal-Fired Power Plants
Leadership changes
Chubu Electric said on 14 September 2026 that President Kingo Hayashi and Chairman Satoru Katsuno would resign on 30 September, and that Minoru Yasui, then a director, would become president on 1 October, according to Arab News. The scandal had come to light in January 2026, after which the Nuclear Regulation Authority suspended its safety review of the Hamaoka plant, the company’s only nuclear site.
What the company is doing next
An independent panel found that workers had felt pressure from senior management to manipulate earthquake data submitted to the regulator, World Nuclear News reported. Chubu said it would submit the withdrawal documents to the Nuclear Regulation Authority as soon as preparations were complete. Chubu shares fell as much as 4.2% after the panel’s report, according to The Edge Malaysia, which cited local media reports. The company has also been criticised for earlier errors in calculating costs used to set retail electricity rates, and it currently has no other nuclear reactors in operation, Bloomberg reported.
Also read: Nissan To Make New Electric Cars, Batteries in Britain · Mazda To Launch 13 Electric Car Models By 2025 · Mobile Data Charges In Tokyo Highest Among 6 Major Cities





China Raises Visa Fees for Japanese Citizens About Sevenfold, Mirroring Japan